The cone crusher cs160 commissioning precautions

The cone crusher cs160 commissioning precautions

The cone crusher cs160 commissioning precautions:
As we all know, each crusher installation should be short after load test so unreasonable, timely maintenance.

The cone crusher cs160 commissioning precautionsThe cone crusher cs160 commissioning precautions
1, before the start of the crusher should check the fastening of the main junction.
2, before the start of the hand plate moving pass part of the rotation of the hollow shaft at least 2-3 laps, to think flexibly limp neck phenomenon only when the car.
3, the crusher start to start the pump should be preceded by, to know each lubrication point lubricant see oil back to the tank before start Crusher.
4, the idle test continuous operation can not be less than 2 hours.
5, broken cone around its own centerline autobiography revolutions are not less than 15 rev / min.
6, the crusher cone revolutions may soon have a negative phenomenon, should be immediately stopped, corrected, at the same time, checks to the oil, and then re-test.
Therefore, the test of the cone crusher is very important.