1800 ton per day copper flotation projects

1800 ton per day copper flotation projects

1800 ton per day copper flotation projects overview:

Material: copper

Output: 1800 tons a day

Equipment: PF impact crusher, hpt hydarulic cone crusher, vertical roller  mill, flotation equipment, ball mill and other auxiliary equipment.

1, Crushing section: tertiary crushing, two class production 120 tons, the broken materail control in 8 mm or less fineness of materials, floor drain storage material, supply 24 hours grinding is used;

2, Grinding section: grind (two way) and flotation section design for three shifts 24 hours, the production of 75 ~ 80 tons; Calibration for grinding fineness of test – 69% 200 mesh, mixing time of 8 minutes, pulp density control ~ in * * * * %, PH calibration * *, * * minutes, flotation time calibration for a coarse two sweep yongjiaxian sanjing;

3, Dehydration section: concentrate and tailings are designed for the two stage dehydration, water control in 10-12%, storage and transportation, easy to concentrate tailings dry line; Waste water use level of precipitation cycles.

Copper processing advantages:

The whole Grinding and crushing plant materials, electricity, water balance design level up to the level of the national level, environmental protection acceptance do zero emissions; . The whole line is expected to start from the run of mine ore, the tailings dry concentrates and the output, the actual production cost is much lower than the industry average, directly for the user to save the production cost of about 2.7 million a year;